Overview
Purpose
To prepare monographic materials for shelving so that they may be available
to patrons as quickly as possible.
Context - Scope
Monographic processing happens in a number of different administrative units.
The standards herein are intended to apply to those functions which occur library-wide
within the scope of "technical monographic processing."
| |
Standards apply to material received and processed by |
| Main Technical Service divisions | * Monographic processing division * Periodicals check-in division * Gifts and Exchange division * Serials/Documents division |
| Shelving units | * all * self-cataloging unit standards may vary |
Other monograph processes are beyond the scope of these standards:
* tracing (see BPM, Tracing Procedures)
* withdrawing monographs. (see BPM, Withdrawal)
* transferring monographs between branch libraries
* "clean-up" of monograph catalog records: reported errors from recon, patrons,
etc.
* claiming
* cancelling
* replacements
Function 1: Check-in
Check-in and invoice-verification procedures depend on the unit in which the
material is being handled and the type of material. In most instances, monographs
are held for selector review. The amount of time held varies by technical services
unit.
Standards
Indicators
Material is processed in a timely manner with no backlogs of unopened mail.
Function 2: GLADIS check for duplication (Branch direct receipt
only)
Search GLADIS by title. Route uncataloged items to Technical Services for cataloging
or to the bindery as appropriate. Mark location on verso of title page. Create
an in-process record per local guidelines.
Standards
Material is batched and checked for duplication weekly.
Indicators
Material is processed weekly with no backlog.
Standards
Items and invoices should be processed within 2-3 weeks.
Indicators
No backlogs of materials older than 2-3 weeks.
Function 4: Route to bookstore, binding, shelving unit or cataloging
Standard
Indicators
No Backlogs of materials older than 4 weeks.
Function 5: Post-Cataloging record check (Technical Services,
marking)
Special workflows include: Reserves, multimedia, mixed media, reference materials,
census items and items bound for storage. These items are usually flagged to
alert receiving units.
Students in the marking workflow check the call number in the book (as pencilled in by Cataloging) against the call number produced by a marking program with OCLC tapeloads. A fair amount of material is not cataloged on OCLC and is typed by students with a similar program. The checking procedure is the same.
Standard
GLADIS errors for monographs is monitored by receiving units; database maintenance
errors leaving Technical Services should not exceed 5%.
Indicators
Complaints by receiving units made back to Technical Services.
Function 6: Post-Cataloging record check (Shelving Units)
Purpose
Most branch units try to recheck the accuracy of the online records as established
by Cataloging in order to ensure access for their users.
Procedures/Considerations
Each shelving unit has its own routines developed over the years to meet the
needs of its primary clientele.
Standard
Materials received in a shelving unit are processed within one week of receipt.
Indicators
No backlogs of materials older than 1 week.
Function 7: Prepare for shelf
All material which returns from cataloging with a spine label is stamped by
Technical Services with UC Berkeley property stamps on the top edge. Monographs
are then shipped to their shelving location.
Shelving locations (including MAIN) are responsible for adding shelving notes, circulation codes as well as tattletaping of non-Promptcat items.
Standards
Indicators
No backlogs of materials older than 1 week.
| TSSC sub-group members who drafted the original standards in consulation with other Library staff | Grace Abiko Margaret McCormick |
| Source document | source document is same as this web document |